Bridge Replacement
The old wooden bridge was replaced with new metal rustic look bridge. To install bride, existing concrete abutment was modified to the new elevation and existing utilities which was running under the bridge were stabilized with cables. The new bridge was prefabricated with exact field dimensions to be fitted and installed with crane.
Concrete Paving / New Lighting / Irrigation
New concrete walkway was constructed with sections of exposed aggregate finish to add beatification of the walkway. There are multiple grade changes to allow storm water to drain to the lake. New light fixtures are installed along with the walkway and modifying existing irrigation system to accommodate the new layout of the park.
Working days
Contract Date
Owner
Contract Amount
Amphitheate
Amphitheater was constructed with the concrete stage and half circled D.G. surfaced area. The rustic benches were installed in three rows with elevated way from the bottom with complied ADA path of travel. The two GFCI electrical outs were installed each corner of stage to provide electrical power for the event.
Signage
The entry monument sign was fabricated with corten weathered steel to provide natural aged look. The monument sign is 7’ tall and 41.5’ long curved shape and installed on concrete footings. The other information signs and amphitheater sign were installed inside of park to provide required information to visitors.
Bitech Construction co., inc.